Acoustic Plaster Specialists complete King Edward IV College in West Midlands.

Acoustic Plaster Specialists complete King Edward IV College in West Midlands

The Project

Pacy and Wheatley Acoustics were delighted to have won the tender for the King Edward IV College in Stourbridge, West Midlands. King Edward VI College is one of the leading academic sixth form colleges in the country. Specialising in A levels and enjoy a national reputation for outstanding teaching and learning as well as results.  The college is regularly ranked as one of the top colleges in the country in regard to academic results, is a Beacon College, and has been formally recognised as 'Outstanding' by Ofsted.

Pacy and Wheatley were commissioned to carry out the installation of approximately 500 m2 of Rockfon Mono Acoustic TE monolithic plaster system within the new state of the art learning facility. The product offers seamless appearance Class A solution to the project. With this Modern method of acoustic solution within the space a great amount of absorption shall be created allowing the modern minimalistic designs to be properly realised.

The building consisted of Drama and performance spaces laboratories, Digital graphics Rooms and practical learning areas.

Mainly standard white colour was chosen with exception of a strong black colour was utilised within one of the drama performance suites.

The Solution

The project was completed on time and to budget this was helped by the working relationship between P&W and Greswolde construction site personnel, a can do attitude from P&W mono installers and help from the Greswolde site team ensured a 1st class product for the client to enjoy this newly built facility and ensure the acoustic control created by the mono TE installation created a calm and peaceful environment for the students and staff to enjoy.

Due to the pitched nature of the works scaffold access to the areas was very difficult and small scissor lifts were utilised to carry out the works.

Testimonials

Pacy & Wheatley were commissioned to install Rockfon Acoustic ceilings in the new Drama and Arts building at King Edward V1 College Stourbridge. I would like to thank all the team at Pacy & Wheatley for delivering a first class job despite the complexity and difficulty associated with accessing the 40 degree and 60 degree pitches of the ceilings on the 1st floor.

I look forward to working with Pacy & Wheatley in the future.Bob Gardner | Site Manager | Greswolde Construction Limited
  • CLIENT: King Edward IV College
  • SECTOR: Specialist Acoustic Plaster System
  • TYPE: Specified
  • PROCUREMENT : Tendered
  • LOCATION: Stourbridge
  • PROJECT VALUE: £75,000

Solution Experts for Acoustic Challenges

Pacy & Wheatley Acoustics

01302760843
eBook Cover

    Download Our

    Flip eBrochure

    Please enter your name and email to access our company eBrochure.

    Please view our Privacy Policy for more information on how we use your data.

      Free Sample for... Acoustic Plaster Specialists complete King Edward IV College in West Midlands

      Fields marked with an * are required.

      For more details on how we handle your data, please view our Privacy Policy

        Contact me regarding... Acoustic Plaster Specialists complete King Edward IV College in West Midlands

        Fields marked with an * are required.

        For more details on how we handle your data, please view our Privacy Policy

          Contact Us Today

          Fields marked with an * are required.

          For more details on how we handle your data, please view our Privacy Policy