The Project
Following the success of phase 1 at the Jesus College in Cambridge, Pacy and Wheatley were asked back to complete a further acoustic plaster installation to the ground and 1st floor of the Webb building and around the new atrium to control and main circulation space which would create a mass of reverberation at certain periods and requires absorption control.