The Project
Pacy and Wheatley Construction, main contractor, had been commissioned to carry out the large extension to the school, contract value c£300,000.00, which included a large new build section, to be utilised as a crèche, designed by T.A.D Architects. Within the crèche T.A.D considered the classroom acoustics seriously and had concerns regarding possible poor classroom acoustics, especially taking into account the overall noise levels from the infant children.
The Solution
Pacy and Wheatley Acoustics supplied and installed their 32mm Ambient Acoustic Plaster System, TAD designed a curved baffle area across a section of the area. The contractor integration and cooperation was simplified due to the main and subcontract work being managed by our parent organisation. The result that followed was an award of two further centers at Newark and Ravenshead which were similarly completed.
- CLIENT: Farmilo Children’s Centre Mansfield
- SECTOR: Specialist Acoustic Ceiling
- TYPE: Specified
- PROCUREMENT : Tendered & Negotiated
- LOCATION: Mansfield
- PROJECT VALUE: £5,000